Agent Project Control Tower

多 Agent 项目进度控制塔 · Git 驱动 · Cloudflare Pages 部署

项目

正常 · green · 通过 · PASS
ID
agent-project-control-tower
名称
Agent 项目控制塔 (原文:Agent Project Control Tower)
简介
用 Git 记录多个 agent 项目的阶段进展,并通过 Cloudflare Dashboard 在线展示。
仓库
conanxin/agent-project-control-tower
位置
本地 · local
分类
未分类 · uncategorized
当前状态
通过 · PASS
健康度
正常 · green
当前阶段
ACT-13D · Dynamic Content Chinese Localization
最近 Agent
local-hermes
最近事件时间
2026-06-12T13:48:35Z
事件数
23

最新事件

阶段 2026-06-12T13:48:35Z · local-hermes · 阶段 ACT-13D
Added a Chinese display layer on top of public-data: 3 project display mappings and 24 event (project_id::phase_id) mappings in apps/dashboard/src/lib/localized-content.ts. Fallback to English is automatic and never breaks the build. Updated ProjectCard / TimelineItem / 4 pages / Help page / Telegram templates. public-data unchanged (3 projects / 2 agents / 24 events).

下一步

Return to wait-for-real-update; trigger ACT-12B when a real project update appears. New events should add a Chinese mapping to localized-content.ts.

时间线(按阶段分组)

23 个事件 · 23 个阶段
ACT-13D — Dynamic Content Chinese Localization 1
阶段 2026-06-12T13:48:35Z · agent-project-control-tower · local-hermes · ACT-13D · 通过 · PASS
Dynamic Content Chinese Localization
Added a Chinese display layer on top of public-data: 3 project display mappings and 24 event (project_id::phase_id) mappings in apps/dashboard/src/lib/localized-content.ts. Fallback to English is automatic and never breaks the build. Updated ProjectCard / TimelineItem / 4 pages / Help page / Telegram templates. public-data unchanged (3 projects / 2 agents / 24 events).
ACT-13B — Chinese Dashboard Help Localization 1
阶段 2026-06-12T11:18:06Z · agent-project-control-tower · local-hermes · ACT-13B · 通过 · PASS
Chinese Dashboard Help Localization
Localized the dashboard UI and Help page into Chinese, including usage workflow, double-door model, and permission boundaries.
ACT-13 — Dashboard Help Page 1
阶段 2026-06-12T09:24:18Z · agent-project-control-tower · local-hermes · ACT-13 · 通过 · PASS
Dashboard Help Page
Added an online Help page to the dashboard so future operators can follow usage workflows directly from the deployed site.
ACT-12 — 周期性 public-data 更新试验 1
阶段 2026-06-12T07:47:14Z · agent-project-control-tower · local-hermes · ACT-12 · 通过 · PASS
周期性 public-data 更新试验
Ran a real recurring public-data update trial using the ACT-11 preflight workflow before manually publishing the reviewed update.
原文
Ran a real recurring public-data update trial using the ACT-11 preflight workflow before manually publishing the reviewed update.
ACT-11 — public-data 更新预检流程 1
阶段 2026-06-12T07:40:01Z · agent-project-control-tower · local-hermes · ACT-11 · 通过 · PASS
public-data 更新预检流程
Added scripts/public_data_update_preflight.py (regenerates public-data + writes 7-artifact review directory), tests/public_update_preflight_smoke.py (12 checks including 1-project downgrade and BookTrans Desk misclassification regression), make public-update-preflight/test, Telegram template, and 10-section human review checklist. No auto-commit/push/deploy. New automation Level 1.5 (assisted local update).
原文
Added scripts/public_data_update_preflight.py (regenerates public-data + writes 7-artifact review directory), tests/public_update_preflight_smoke.py (12 checks including 1-project downgrade and BookTrans Desk misclassification regression), make public-update-preflight/test, Telegram template, and 10-section human review checklist. No auto-commit/push/deploy. New automation Level 1.5 (assisted local update).
ACT-9C — 导出计划审查工作流 1
阶段 2026-06-12T04:55:06Z · agent-project-control-tower · local-hermes · ACT-9C · 通过 · PASS
导出计划审查工作流
Added a tracked public-data export plan and aligned publish-preflight, candidate artifacts, and review checklists around it.
原文
Added a tracked public-data export plan and aligned publish-preflight, candidate artifacts, and review checklists around it.
ACT-9B — CI 候选导出 Artifact 原型 1
阶段 2026-06-12T03:02:22Z · agent-project-control-tower · local-hermes · ACT-9B · 部分完成 · PARTIAL
CI 候选导出 Artifact 原型
Implemented Level 3 proposed-export artifact prototype (candidate script + tests + workflow + Makefile). Local make candidate / candidate-fixture / candidate-test all PASS. CI dispatch deferred to manual step (no GITHUB_TOKEN); the workflow file is committed and visible on main, awaiting human trigger from the Actions UI.
原文
Implemented Level 3 proposed-export artifact prototype (candidate script + tests + workflow + Makefile). Local make candidate / candidate-fixture / candidate-test all PASS. CI dispatch deferred to manual step (no GITHUB_TOKEN); the workflow file is committed and visible on main, awaiting human trigger from the Actions UI.
ACT-9 — public-data 导出自动化策略 1
阶段 2026-06-12T01:44:19Z · agent-project-control-tower · local-hermes · ACT-9 · 通过 · PASS
public-data 导出自动化策略
Documented the public-data automation boundary, double-door model, and allowed automation levels before implementing any CI export automation.
原文
Documented the public-data automation boundary, double-door model, and allowed automation levels before implementing any CI export automation.
ACT-8B — 生成命令的多 Agent 试验 1
阶段 2026-06-12T01:25:50Z · agent-project-control-tower · local-hermes · ACT-8B · 通过 · PASS
生成命令的多 Agent 试验
Validated the ACT-7B command generator in a second-agent trial and confirmed it prevents multi-line command and CLI/template drift errors.
原文
Validated the ACT-7B command generator in a second-agent trial and confirmed it prevents multi-line command and CLI/template drift errors.
ACT-8B-review — 第二个 Agent 对生成命令试验的复查 1
复查 2026-06-12T01:20:14Z · agent-project-control-tower · cloud-openclaw · ACT-8B-review · 通过 · PASS
第二个 Agent 对生成命令试验的复查
Used the ACT-7B command generator to run a second-agent review flow without hand-written multi-line tower.py commands.
原文
Used the ACT-7B command generator to run a second-agent review flow without hand-written multi-line tower.py commands.
ACT-8 — 真实多 Agent 上手试验 1
阶段 2026-06-12T00:01:43Z · agent-project-control-tower · local-hermes · ACT-8 · 通过 · PASS
真实多 Agent 上手试验
Ran a real onboarding trial with a second agent (cloud-openclaw on a real cloud VPS) and fed the 10 findings back into the playbooks and templates. Six playbook / template gaps were patched in this act; three tool limitations are documented as workarounds for a follow-up code patch. Trial agent's REVIEW_REPORT is now part of the public timeline. Two-gate model held: trial agent only wrote to its own data/, only local-hermes exported and pushed.
原文
Ran a real onboarding trial with a second agent (cloud-openclaw on a real cloud VPS) and fed the 10 findings back into the playbooks and templates. Six playbook / template gaps were patched in this act; three tool limitations are documented as workarounds for a follow-up code patch. Trial agent's REVIEW_REPORT is now part of the public timeline. Two-gate model held: trial agent only wrote to its own data/, only local-hermes exported and pushed.
ACT-8-review — 第二个 Agent 对 ACT-7 手册的复查 1
复查 2026-06-11T23:48:25Z · agent-project-control-tower · cloud-openclaw · ACT-8-review · 通过 · PASS
第二个 Agent 对 ACT-7 手册的复查
ACT-8 cross-machine onboarding trial PASS. Cloned the tower on a fresh cloud box, ran make all, validated the data path, registered cloud-openclaw, and submitted this review. Three small gaps surfaced: (1) data/ does not exist on a fresh clone, so the very first validate fails; playbook should call out a bootstrap step. (2) tests/smoke.py hardcodes python while the rest of the build uses python3; on Debian/Ubuntu boxes without the python alias, make test fails. (3) make publish-preflight is opt-in and not part of make all; trial agent might assume it is. Otherwise the ACT-7 playbooks and templates were sufficient to drive a real cross-machine onboarding end-to-end with no token / IP / home path / data leak and no public-data touched. Design reason: trial is intentionally cross-machine to exercise docs/MULTI_MACHINE_SETUP.md and the agent/human two-gate model in docs/OPEN_SOURCE_PLAN.md section 11.3.1. Impact analysis: local-hermes can patch the three small gaps with a 1-line data-bootstrap hint, a python-alias hint, and a publish-preflight opt-in clarification. No source code change in any of the three real projects.
原文
ACT-8 cross-machine onboarding trial PASS. Cloned the tower on a fresh cloud box, ran make all, validated the data path, registered cloud-openclaw, and submitted this review. Three small gaps surfaced: (1) data/ does not exist on a fresh clone, so the very first validate fails; playbook should call out a bootstrap step. (2) tests/smoke.py hardcodes python while the rest of the build uses python3; on Debian/Ubuntu boxes without the python alias, make test fails. (3) make publish-preflight is opt-in and not part of make all; trial agent might assume it is. Otherwise the ACT-7 playbooks and templates were sufficient to drive a real cross-machine onboarding end-to-end with no token / IP / home path / data leak and no public-data touched. Design reason: trial is intentionally cross-machine to exercise docs/MULTI_MACHINE_SETUP.md and the agent/human two-gate model in docs/OPEN_SOURCE_PLAN.md section 11.3.1. Impact analysis: local-hermes can patch the three small gaps with a 1-line data-bootstrap hint, a python-alias hint, and a publish-preflight opt-in clarification. No source code change in any of the three real projects.
ACT-7 — 多机 Agent 使用手册 1
阶段 2026-06-11T23:33:57Z · agent-project-control-tower · local-hermes · ACT-7 · 通过 · PASS
多机 Agent 使用手册
Added multi-machine usage playbooks, Telegram command templates, and public-data review checklists for repeatable agent onboarding.
原文
Added multi-machine usage playbooks, Telegram command templates, and public-data review checklists for repeatable agent onboarding.
ACT-6C — 第三个真实项目公开导出 1
阶段 2026-06-11T15:24:39Z · agent-project-control-tower · local-hermes · ACT-6C · 通过 · PASS
第三个真实项目公开导出
Published BookTrans Desk as the third real project in public-data and verified the online dashboard. public-data now contains 3 real projects / 1 agent / 14 events.
原文
Published BookTrans Desk as the third real project in public-data and verified the online dashboard. public-data now contains 3 real projects / 1 agent / 14 events.
ACT-6B — 第二个真实项目公开导出 1
阶段 2026-06-11T14:42:34Z · agent-project-control-tower · local-hermes · ACT-6B · 通过 · PASS
第二个真实项目公开导出
Connected second real open-source project artvee-gallery to the public dashboard. public-data now contains 2 real projects / 1 agent / 12 events. export_public_data.py multi-project union export verified. Cloudflare Pages re-deployed automatically after push; all 5 target URLs return 200 with expected content.
原文
Connected second real open-source project artvee-gallery to the public dashboard. public-data now contains 2 real projects / 1 agent / 12 events. export_public_data.py multi-project union export verified. Cloudflare Pages re-deployed automatically after push; all 5 target URLs return 200 with expected content.
ACT-6 — 首个真实项目公开导出 1
阶段 2026-06-11T14:16:58Z · agent-project-control-tower · local-hermes · ACT-6 · 通过 · PASS
首个真实项目公开导出
Exported the first real project status to public-data and verified the online dashboard on the custom domain. public-data upgraded from demo 2/3/3 to real 1/1/8 (agent-project-control-tower itself). public-data is the only online data source; data/ remains gitignored and private. Commit d452b84 pushed; CF Pages re-deploy triggered.
原文
Exported the first real project status to public-data and verified the online dashboard on the custom domain. public-data upgraded from demo 2/3/3 to real 1/1/8 (agent-project-control-tower itself). public-data is the only online data source; data/ remains gitignored and private. Commit d452b84 pushed; CF Pages re-deploy triggered.
ACT-5B — 自定义域名验证 1
阶段 2026-06-11T12:42:21Z · agent-project-control-tower · local-hermes · ACT-5B · 通过 · PASS
自定义域名验证
Verified custom domain for the online Cloudflare Pages dashboard while keeping public-data as the only publish data source. Custom domain control-tower.conanxin.com bound and active; 7/7 URL HTTP 200; 2/3/3 entity visible; sensitive scan 0 hits; pages.dev fallback continues to serve the same dist. Real data/ remains private.
原文
Verified custom domain for the online Cloudflare Pages dashboard while keeping public-data as the only publish data source. Custom domain control-tower.conanxin.com bound and active; 7/7 URL HTTP 200; 2/3/3 entity visible; sensitive scan 0 hits; pages.dev fallback continues to serve the same dist. Real data/ remains private.
ACT-5 — Cloudflare Pages 上线验证 1
阶段 2026-06-11T11:43:38Z · agent-project-control-tower · local-hermes · ACT-5 · 通过 · PASS
Cloudflare Pages 上线验证
Verified first online Cloudflare Pages dashboard using public-data as the publish data source. 7/7 URL HTTP 200, 2 projects / 3 agents / 3 events visible, sensitive scan 0 hits. Real data/ remains private.
原文
Verified first online Cloudflare Pages dashboard using public-data as the publish data source. 7/7 URL HTTP 200, 2 projects / 3 agents / 3 events visible, sensitive scan 0 hits. Real data/ remains private.
ACT-3A — Astro 面板骨架 1
阶段 2026-06-11T03:37:58Z · agent-project-control-tower · local-hermes · ACT-3A · 通过 · PASS
Astro 面板骨架
Added Astro dashboard shell with index, project detail, agent detail, and timeline pages using generated/index.json as the data source.
原文
Added Astro dashboard shell with index, project detail, agent detail, and timeline pages using generated/index.json as the data source.
ACT-1 — 本地数据流原型 1
阶段 2026-06-11T03:21:00Z · agent-project-control-tower · local-hermes · ACT-1 · 通过 · PASS
本地数据流原型
Built zero-dependency data flow from events to generated index and embedded HTML dashboard.
原文
Built zero-dependency data flow from events to generated index and embedded HTML dashboard.
ACT-2 — Tower CLI 与事件上报 1
阶段 2026-06-11T03:21:00Z · agent-project-control-tower · local-hermes · ACT-2 · 通过 · PASS
Tower CLI 与事件上报
Added stdlib tower CLI with register/report/build/validate commands, redaction checks, and 53/53 passing smoke tests.
原文
Added stdlib tower CLI with register/report/build/validate commands, redaction checks, and 53/53 passing smoke tests.
ACT-0 — 项目设计与架构 1
阶段 2026-06-11T03:20:59Z · agent-project-control-tower · local-hermes · ACT-0 · 通过 · PASS
项目设计与架构
Completed project vision, architecture, data model, workflow, MVP plan, and design report.
原文
Completed project vision, architecture, data model, workflow, MVP plan, and design report.
(未分组) 1
项目注册 2026-06-11T03:20:59Z · agent-project-control-tower · local-hermes · 进行中 · ACTIVE
(注册事件)
project 'agent-project-control-tower' registered: Agent Project Control Tower
原文
project 'agent-project-control-tower' registered: Agent Project Control Tower